| 1. | Precast prestressed tubular pile 预制预应力管状桩 |
| 2. | Study on application of pre - stressed tubular pile in shantou district 预应力管桩在汕头地区施工中几个问题的探讨 |
| 3. | Construction technology of strengthening soft foundation by cast - in - situ concrete thin - wall tubular pile 现浇混凝土薄壁管桩加固软土地基技术 |
| 4. | Experiment and inverse analysis for mechanical properties of large diameter prestressed concrete tubular pile at seaport 海港大管桩力学性能实验测试与反演研究 |
| 5. | Research on influence of soil core on bearing character of large - diameter tubular pile using cast - in - situ concrete 大直径薄壁灌注筒桩土芯对承载性状影响的试验及其理论研究 |
| 6. | Key points of quality management in the production of tubular pile as well as the suggestion on the establishment of industry supervision 管桩生产的质量管理重点与建立行业监管的建议 |
| 7. | Thin - wall cast - in - situ tubular pile is a new type of high quality pile , which has been applied in soft ground treatment 摘要大直径现浇混凝土薄壁筒桩为高速公路软弱地基处理中的一种新型高效优质桩。 |
| 8. | Determining and improving the bearing capacity of steel tubular piles for piled wharfs has long been an issue that the engineering field has endeavored to study and solve 摘要确定和提高高桩码头钢管桩的承载力是工程界一直致力于研究的问题。 |
| 9. | When installing steel tubular piles in regions where granite is shallowly overburdened , the piles are easy to deviate and the pile tip is easy to warp , resulting in slow driving 摘要在浅覆盖层花岗岩地区进行钢管桩施工,存在易偏位、桩尖易卷口和进度慢等技术难题。 |
| 10. | These problems are discussed in the light of the construction of the steel tubular pile foundations for bahekou heavy cargo wharf in the three gorges and yangjiawan container & general cargo wharf 文章依托三峡坝河口重件码头和杨家湾集装箱杂货码头钢管桩基础工程,探讨了以上问题。 |